New Royal Papworth Hospital, Cambridge
-
124 Boreholes
-
150m depth
-
32mm double loops
-
Main contractor: Skanska
-
Date completed: Oct 2015
This project restored Skanska's belief in geothermal installations and GTD was awarded on the back of this AstraZenica's new HQ & RND facilities which was estimated to be the largest geothermal project in Europe.

New_hospital_Jan_19_2

New_hospital_Jan_19_2
1/1
IKEA, Reading
-
24 Boreholes & 1 Water Well
-
150m depth
-
40mm single loops
-
Main contractor: IKEA
-
Date completed: Aug 2016
This job was drilled close to the M4 motorway with simultaneous air and mud drilling.

IKEA Reading

IKEA Reading
1/1
Cuenca Railway Station
-
90 Boreholes
-
100m depth
-
32mm single loops
-
Main contractor: GI
-
Date completed: Aug 2008
Not only did we drill this project we were also asked to train Spanish drillers on site and teach them the art of mud drilling, after some long siestas.